2013年6月5日星期三

Inspection Finished R60702 Zirconium tubes for Heat exchangers

Pictures for Main Product inspection & Testing

1. Pneumatic Test

2. Pneumatic Test

3. Roughness Measurement (Calibration)

Roughness measurement (inside surface) 

5. Roughness measurement (outside surface) 

6. Diameter measurement (end of tube) 

7. Diameter measurement (middle of tube)

8. Wall Thickness Measurement 

9. Length measurement  


10. Verification of marking (Sign Stamp)

11. Packing Condition 




 Above is Mingkun's Inspection procedure, the product is R60702 Zirconium tubes.

没有评论:

发表评论